Yardene Engineering 2000 Limited
Engineering Works
Autumn Anti-Black Rail
Track Gauging
Company Profile
Contact Yardene
Home

ISO 9001

Link-up

Company Profile

Yardene Engineering Ltd. was formed in 1973 for the purpose of manufacturing safety equipment for Railway Systems. In the mid-80's emergency signalling and rail gauging equipment was added to the product range. The company was re-named at the end of 1999 to Yardene Engineering 2000 Ltd. 

Emergency Signalling

The Miniature Emergency LED Warning Board (EWB) is fitted with a rechargeable battery with a life cycle of 11 days between charges, and the Large Emergency LED Warning Board (EWB) is fitted with a rechargeable battery with a life cycle of 30 days between charges.  Both are fully insulated for 3rd rail and signalling protection.

Lightweight TSR & ESR Track Magnets

YELLOW magnet (Standard Strength)                            - PADS No. 062/006787
GREEN magnet (Extra Strength for 3rd Rail areas)            - PADS No. 062/006788

Both types are FULLY approved by Network Rail and can be fitted to all types of rail profile.  These units have been especially designed to facilitate ease of handling and transportation.  Working in conjunction with Network Rail we have developed a Training Course to assist you with rail safety.

Other Products

Emergency Railhead Cleaning Unit (ERCU); Single Sand Pram Unit (SSPU); Platform Level Gauge; Optic & Target Stand; Cross Level Board; Cant Step; Track Alignment & Benching Equipment; Hallade Handle Kits;
Spares.

Major Clients: Network Rail, Eurotunnel, Amey Infrastructure, Amec Logistics, Amec Spie, Balfour Beatty Rail Maintenance, Balfour Beatty Rail Renewals, Unipart Rail, Carillion Construction, Carillion Rail, London Underground.

All products and services supplied by Yardene Engineering 2000 are in accordance with BS 5750 Part 2 and ISO 9001




   MAKE AN ENQUIRY  
ENGINEERING WORKS | AUTUMN ANTI-BLACK RAIL | TRACK GAUGING
COMPANY PROFILE | CONTACT YARDENE | HOME